Skip to content
Snippets Groups Projects
  1. Dec 30, 2023
    • w4tsn's avatar
      update ledrail.scad · 7c417249
      w4tsn authored
      Add a cone for the screw heads and use actual screw parameters for
      length and width.
      
      Remove wago / 5V IN compartment and reduce complexity.
      
      Widen the cable duct on the inside for more space of the three cables
      between the esp and the strip.
      
      Integrate the back side-plate and only use one removal for accessing the
      esp and led strip.
      
      Introduce a tolerance variable to take into account that the acryl glass
      is not always exactly as thick as advertised.
      7c417249
  2. Aug 20, 2023